CULTURA
Lavora con noi
Iscriviti alla newsletter
I più cliccati della settimana
Archivio blog
- ► 2025 (1626)
- ► 2024 (2695)
- ► 2023 (2311)
- ► 2022 (1425)
- ► 2021 (1236)
- ► 2020 (1389)
- ► 2019 (1517)
- ► 2018 (1670)
- ► 2017 (1497)
- ► 2016 (2092)
-
▼
2015
(3095)
-
▼
agosto
(201)
-
▼
ago 17
(9)
- Nasce la App. mobile di Siremar Compagnia delle Isole
- Offshore Energy 2016
- 2nd Mare Forum Monaco Yacht Summit
- Mast Security update: Yemen & Libya
- Le aziende del Nord Est di fronte al passaggio gen...
- Demanio marittimo, operazione di controllo
- Agenti marittimi: appello al governo per le grandi...
- First offshore contract for Aco Marine’s New clari...
- 115 milioni di fondi UE all'Abruzzo
-
▼
ago 17
(9)
-
▼
agosto
(201)
- ► 2014 (3037)
First offshore contract for Aco Marine’s New clarimar MF
ACO Marine has signed a contract to supply a bespoke version of its new Clarimar MF wastewater treatment plant to the CFT 623 wellhead platform under construction for Dubai’s Dragon Oil. The specially adapted Clarimar MF-2 has capacity to treat 3.5m3 of black and grey wastewater a day and features a sludge tankfor liquid discharges from drilling operations. “The offshore oil and gas sector is an important market for ACO Marine - said Managing Director Mark Beavis - We have delivered a number of systems for installation to offshore rigs in the past, but this is the first offshore contract we have received for the new Clarimar MF. This prestigious contract will open the door of opportunity to supply equipment to other offshore projects”. Due to the platform’s location, the end-user required a system proven to meet the stringent environmental regulations governing oil and gas production in the ecologically sensitive Caspian Sea. ACO Marine’s system, type-approved by Bureau Veritas according to new IMO MEPC 227 (64) requirements, incorporates a unique “Bio-Sword” filtration technology capable of replacing the settling and chlorination stages found in more traditional biological wastewater treatment systems. “The Bio-Sword allows the system to operate in environments with bio-mass concentrations up top four times greater than conventional plants, greatly reducing activation tank volume, system footprint and maintenance requirements” said Beavis. The system ACO Marine will supply in September has double piping and system componentry, and is manufactured from durable PPFR composite which, unlike coated black steel, is light weight and completely resistant to corrosion. In February 2014, Dragon Oil awarded a contract for the engineering, construction, and installation of the Dzheitune (Lam) E wellhead and production platform and associated pipelines. Detailed engineering and fabrication is underway with theplatform due for completion in 2016.
- Blog Comments
- Facebook Comments
Translate all the news into your language
Post in evidenza
L'AGCM approva l'uscita di SAS da Moby
27 ottobre 2025 - L’Autorità Garante della Concorrenza e del Mercato (AGCM) ha approvato e reso vincolanti gli impegni presentati da SAS – S...
I più cliccati degli ultimi 30 giorni
-
6 ottobre 2025 - Il conflitto israelo-palestinese e la missione della Global Sumud Flotilla hanno riacceso il dibattito sulla sovranità dell...
-
15 ottobre 2025 - Fincantieri lancia il primo sistema di droni subacquei DEEP in una missione di dimostrazione che si terrà giovedì 23 ottob...
-
20 ottobre 2025 - Fincantieri ha siglato un accordo strategico per accelerare lo sviluppo delle unità autonome di superficie di Defcomm, sta...
-
6 ottobre 2025- Il Vice Presidente del Consiglio e Ministro delle Infrastrutture e dei Trasporti, Matteo Salvini, ha firmato il decreto con ...
-
2 ottobre 2025 - Il mercato crocieristico si prepara a una crescita significativa nei prossimi dieci anni, con l’ingresso di 70 nuove navi i...
-
5 Ottobre 2025 - Fincantieri parteciperà all’edizione di “Barcolana 57”, storica regata internazionale di Trieste in programma fino al 12 ot...



.gif)











.jpg)



